Xinneng Energy Co., Ltd. Reduced Emission of Concentrated Br
time:2016-01-12 count : writer:admin Water Treatment Flow: 180m3/hProduct Model: PX-180
Operation Time: 2015
Location: Neimenggu
The system uses two sets of PX-180, 5 pneumatic valves and 4 flowmeters to achieve automatic control.
Cost Comparison
Electricity
Power Cost in RMB 0.70
Permeate Flow ( CMH ) 108.80 | ||||||
Capital Cost in RMB | Operating Cost In RMB | |||||
Electricity Consumption kwh/m3 | 1 Year Power Cost | 2 Year Power Cost | 5 Year Power Cost | 20 Year Power Cost | ||
PX | 2 | 1,218,560 | 2,437,120 | 6,092,800 | 24,371,200 | |
Original | 3.15 | 1,919,232 | 3,838,464 | 9,596,160 | 38,384,640 | |
Difference in Capital Cost in RMB | 1,000,000 | |||||
Difference in Operating Cost In RMB | 700,672 | 1,401,344 | 3,503,360 | 14,013,440 | ||
Difference In Total in RMB (Capital & Operating) | -299,328 | 401,344 | 2,503,360 | 13,013,440 | ||
Net Saving In RMB | -299,328 | 401,344 | 2,503,360 | 13,013,440 |
Remark: Calculated by 8000 running hours per year, high-pressure pump efficiency at 75%, booster pump efficiency at 75%, motor efficiency at 93%.
The original system is improved by adding 2 PX-180 after the concentrated brine discharge end to recovery the energy which would be wasted otherwise. The application of PX reduces total cost irrespective of extra investment in energy recovery device and associated accessories, which could be recovered in one and a half year and goes on to save a large amount of electricity cost for end users. Calculated by 20 years running time, PX application in the system will save our customer 13 million RMB.